Page 1 of 1

conditional value at risk (Cvar)

Posted: Tue Jul 20, 2021 12:34 pm
by behrad
Hi
I have a risk-constrained two-stage stochastic optimization problem. However, the Cvar value does not change with the Beta changes. (Beta is Weighting factor for the values of expected cost and risk).
Can anyone guide me on this?