A constant number in an equation changes its value when run

Problems with syntax of GAMS
Post Reply
SupplyChainGuy
User
User
Posts: 2
Joined: 7 years ago

A constant number in an equation changes its value when run

Post by SupplyChainGuy »

I had defined a constant number as a multiple of a variable in a summation equation. After running the model, on checking the equation tab, I find that the constant value changes for every expanded term and thus resulting in wrong results.

For example,

If Objective.. profit =e= sum(c, x(c)*10000) has been defined, when the code is run, in the equation tab, i see the equation expanded as

10541*x(First_Term_in_Set_C)+10324*x(Second_Term_in_Set_C)

I have no idea how a defined constant 10000 changes its value when the code is run.

Anybody with any idea about this, please help.
Post Reply