Hello all,
I am trying to solve a model using C&CG, and there is a problem about the solution: Infeasibility row 'eqcut1(2.24)': 0 = -1. The solution summary is as follows.
MODEL master OBJECTIVE TC
TYPE MIP DIRECTION MINIMIZE
SOLVER CPLEX FROM LINE 314
**** SOLVER STATUS 1 NORMAL COMPLETION
**** MODEL STATUS 10 INTEGER INFEASIBLE
I try my best to correct it, however, there is no effect. I would like to ask if anyone can help me to find out the problem in the model?
Thank you.
Li
Infeasibility row 'eqcut1(2.24)': 0 = -1
Infeasibility row 'eqcut1(2.24)': 0 = -1
- Attachments
-
- Find_ini3.gms
- (11.06 KiB) Downloaded 217 times
-
- data.xls
- (31.5 KiB) Downloaded 219 times