Worry with time horizon in dynamic CGE (Simulation)

Problems with modeling
Post Reply
Rodrigue
User
User
Posts: 36
Joined: 6 years ago

Worry with time horizon in dynamic CGE (Simulation)

Post by Rodrigue »

Hello GAMS users,

I need your support in my GAMS code attached below.

I have adapted my SAM to the dynamic CGE model of PEP network. It normally replicates the baseline. However, in simulations where I set the time horizon at 10, it doesn't work properly. In very few cases, I obtain the results on 3 years only. Also, I would like to apply a 10 percentage change in exogenous variables but currently it does not exceed 2%.

How can I come over these issues?

I attached all the necessary files.

With regards,

Rodrigue
Attachments
RESULTS PEP 1-t SIM1.GMS
(24.49 KiB) Downloaded 130 times
RESULTS PEP 1-t BAU.GMS
(17.29 KiB) Downloaded 107 times
para_agg.xlsx
(22.67 KiB) Downloaded 100 times
Tabac_Agg.gms
(65.65 KiB) Downloaded 114 times
MCS.xlsx
(91.72 KiB) Downloaded 100 times
Post Reply