Page 1 of 1

Worry with time horizon in dynamic CGE (Simulation)

Posted: Tue Aug 08, 2023 6:40 pm
by Rodrigue
Hello GAMS users,

I need your support in my GAMS code attached below.

I have adapted my SAM to the dynamic CGE model of PEP network. It normally replicates the baseline. However, in simulations where I set the time horizon at 10, it doesn't work properly. In very few cases, I obtain the results on 3 years only. Also, I would like to apply a 10 percentage change in exogenous variables but currently it does not exceed 2%.

How can I come over these issues?

I attached all the necessary files.

With regards,

Rodrigue